rkm-logo
  • Where We Build
    • Available Listings
  • What We Do
  • Portfolio
  • About Us
  • Ask A Builder
  • Locations
    • Aurora
    • Castle Rock
    • Centennial
    • Elizabeth
    • Englewood
    • Larkspur
    • Littleton
    • Lone Tree
    • Deer Trail
  • Blog
  • CONTACT US
Contact Us

How Do You Build a Walk-Out Basement on a Sloped Custom Home Lot?

by sem | Jul 12, 2026 | Uncategorized

A walk-out basement turns challenging slope into an asset: it gives you daylighted lower-level living, direct backyard access, and often extra square footage without the feel of an underground space. On a Denver-area lot the first step is a thorough site evaluation —...

What Is a Tandem Garage Configuration Below Grade in a Custom Home?

by sem | Jul 12, 2026 | Uncategorized

A tandem garage below grade pairs two concepts: a tandem layout—where vehicles park one behind another in a deep bay—and a garage that sits partially or fully below the finished ground level. For custom homes on tight or sloped Denver lots, that usually means carving...

How Is Radon Tested and Mitigated in a New Custom Home During Construction?

by sem | Jul 11, 2026 | Uncategorized

Radon is an invisible, odorless radioactive gas that comes from uranium breakdown in soil and can enter new homes through foundation joints, utility penetrations, and porous concrete. In the Denver area and many parts of Colorado the natural geology produces elevated...

What Permits Are Required to Finish a Basement in a Colorado Custom Home?

by sem | Jul 11, 2026 | Uncategorized

Finishing a basement in Colorado isn’t just a paint-and-floor decision — it’s a construction project that typically requires multiple permits and sequential inspections to meet local building codes, safety standards, and insurance requirements. Permits protect you and...

How Long Does It Take to Waterproof and Finish a Custom Home Basement?

by sem | Jul 11, 2026 | Uncategorized

When we build a custom home on your lot in the Denver area, waterproofing the basement is not a one‑day item — it’s a sequence that must be coordinated with foundation work, weather, and permitting. For a new poured foundation, expect waterproofing activities to be...
« Older Entries
Next Entries »

Recent Posts

  • How Do You Plan a Dog-Washing Station in a New Home?
  • How Can a Main-Floor Bedroom Provide Privacy Without Feeling Isolated?
  • What Doorway Details Can Make Moving Furniture and Mobility Equipment Easier?
  • How Do You Design a Kitchen With Work Surfaces at Different Heights?
  • How Do You Make a Guest Bathroom Easier for Visitors With Limited Mobility?

Recent Comments

  1. rkmhomes on Building a New Home

Copyright RKM Homes | All Rights Reserved | Terms of Use | Powered by JEMSU | Sitemap XML |